Regulation (EU) 2024/3110 of the European Parliament and of the Council of 27 Nov... (32024R3110) 
                
                
            INHALT
Regulation (EU) 2024/3110 of the European Parliament and of the Council of 27 November 2024 laying down harmonised rules for the marketing of construction products and repealing Regulation (EU) No 305/2011 (Text with EEA relevance)
- REGULATION (EU) 2024/3110 OF THE EUROPEAN PARLIAMENT AND OF THE COUNCIL
 - of 27 November 2024
 - laying down harmonised rules for the marketing of construction products and repealing Regulation (EU) No 305/2011
 - (Text with EEA relevance)
 - CHAPTER I
 - GENERAL PROVISIONS
 - Article 1
 - Subject matter and objectives
 - Article 2
 - Scope
 - Article 3
 - Definitions
 - Article 4
 - Working plan and preparatory phase for the development of harmonised technical specifications
 - Article 5
 - Harmonised standards laying down essential characteristics dealing with performance
 - Article 6
 - Other harmonised technical specifications laying down essential characteristics
 - Article 7
 - Product requirements and harmonised standards conferring a presumption of conformity
 - Article 8
 - Common specifications conferring a presumption of conformity
 - Article 9
 - General product information, instructions for use and safety information
 - Article 10
 - Assessment and verification systems
 - Article 11
 - Harmonised zone and national measures
 - Article 12
 - Relationship with other Union law
 - CHAPTER II
 - PROCEDURE, DECLARATIONS AND MARKINGS
 - Article 13
 - Declaration of performance and conformity
 - Article 14
 - Exemptions from drawing up a declaration of performance and conformity
 - Article 15
 - Content of the declaration of performance and conformity
 - Article 16
 - Supply of the declaration of performance and conformity
 - Article 17
 - General principles and use of CE marking
 - Article 18
 - Rules and conditions for the affixing of CE marking
 - Article 19
 - Other markings and performance claims
 - CHAPTER III
 - OBLIGATIONS AND RIGHTS OF ECONOMIC OPERATORS
 - Article 20
 - Obligations of all economic operators
 - Article 21
 - Rights of manufacturers
 - Article 22
 - Obligations of manufacturers
 - Article 23
 - Obligations of authorised representatives
 - Article 24
 - Obligations of importers
 - Article 25
 - Obligations of distributors
 - Article 26
 - Cases in which obligations of manufacturers apply to importers and distributors
 - Article 27
 - Obligations of fulfilment service providers
 - Article 28
 - Obligations of online marketplaces
 - Article 29
 - Online and other distance sales
 - Article 30
 - Implementing acts regarding the obligations and rights of economic operators
 - CHAPTER IV
 - EUROPEAN ASSESSMENT DOCUMENTS
 - Article 31
 - European assessment documents
 - Article 32
 - Principles and procedure for the development and adoption of European assessment documents
 - Article 33
 - Obligations of the TAB receiving a request for a European technical assessment
 - Article 34
 - Publication of references
 - Article 35
 - Content of the European assessment document
 - Article 36
 - Formal objections against European assessment documents
 - Article 37
 - European technical assessment
 - CHAPTER V
 - TECHNICAL ASSESSMENT BODIES
 - Article 38
 - Designating authorities
 - Article 39
 - Designation, monitoring and evaluation of TABs
 - Article 40
 - Requirements for TABs
 - Article 41
 - Coordination of TABs
 - CHAPTER VI
 - NOTIFYING AUTHORITIES AND NOTIFIED BODIES
 - Article 42
 - Notification
 - Article 43
 - Notifying authorities
 - Article 44
 - Requirements relating to notifying authorities
 - Article 45
 - Coordination of notifying and designating authorities
 - Article 46
 - Requirements relating to notified bodies
 - Article 47
 - Presumption of conformity of notified bodies
 - Article 48
 - Subsidiaries and subcontractors of notified bodies
 - Article 49
 - Use of facilities outside the testing laboratory of the notified body
 - Article 50
 - Application for notification
 - Article 51
 - Notification procedure
 - Article 52
 - Identification numbers and lists of notified bodies
 - Article 53
 - Changes to the notification
 - Article 54
 - Challenge of the competence of notified bodies
 - Article 55
 - Operational obligations of notified bodies
 - Article 56
 - Information obligations of notified bodies
 - Article 57
 - Implementing acts on notified bodies’ obligations
 - Article 58
 - Coordination of notified bodies
 - CHAPTER VII
 - SIMPLIFIED PROCEDURES
 - Article 59
 - Replacement of type-testing and type-calculation
 - Article 60
 - Use of simplified procedures by micro-enterprises
 - Article 61
 - Custom-made non-series products
 - Article 62
 - Recognition of assessment and verification by another notified body
 - CHAPTER VIII
 - MARKET SURVEILLANCE AND SAFEGUARD PROCEDURES
 - Article 63
 - Complaint portal
 - Article 64
 - Market surveillance authorities and single liaison point
 - Article 65
 - Procedure to deal with non-compliance
 - Article 66
 - Union safeguard procedure
 - Article 67
 - Compliant products which nevertheless present a risk
 - Article 68
 - Market surveillance coordination and support
 - Article 69
 - Recovery of costs
 - Article 70
 - Reporting and benchmarking
 - CHAPTER IX
 - INFORMATION AND ADMINISTRATIVE COOPERATION
 - Article 71
 - Information systems for harmonised decision-making
 - Article 72
 - Product contact points for construction
 - Article 73
 - Training and exchange of staff
 - Article 74
 - Shared roles and joint decision-making
 - CHAPTER X
 - DIGITAL PRODUCT PASSPORT
 - Article 75
 - Construction digital product passport system
 - Article 76
 - Digital product passport
 - Article 77
 - General requirements for the digital product passport
 - Article 78
 - Technical design and operation of the digital product passport
 - Article 79
 - Unique identifiers and digital product passport registry
 - Article 80
 - Mandatory use and technical adaptation
 - CHAPTER XI
 - INTERNATIONAL COOPERATION
 - Article 81
 - International cooperation
 - CHAPTER XII
 - INCENTIVES AND PUBLIC PROCUREMENT
 - Article 82
 - Member State incentives for construction products
 - Article 83
 - Green public procurement
 - CHAPTER XIII
 - REGULATORY STATUS OF PRODUCTS
 - Article 84
 - Regulatory status of products
 - CHAPTER XIV
 - EMERGENCY PROCEDURES
 - Article 85
 - Application of emergency procedures
 - Article 86
 - Prioritisation of the assessment and verification of crisis-relevant construction products
 - Article 87
 - Assessment and declaration of performance based on standards and common specifications
 - Article 88
 - Prioritisation of market surveillance activities and mutual assistance among authorities
 - CHAPTER XV
 - FINAL PROVISIONS
 - Article 89
 - Delegated acts
 - Article 90
 - Committee procedure
 - Article 91
 - Electronic applications, decisions, documentation and information
 - Article 92
 - Penalties
 - Article 93
 - Evaluation
 - Article 94
 - Repeal
 - Article 95
 - Derogations and transitional provisions
 - Article 96
 - Entry into force
 - ANNEX I
 - Basic requirements for construction works
 - 1. Structural integrity of construction works
 - 2. Fire safety of construction works
 - 3. Protection against adverse hygiene and health impacts related to construction works
 - 4. Safety and accessibility of construction works
 - 5. Resistance to the passage of sound and acoustic properties of construction works
 - 6. Energy efficiency and thermal performance of construction works
 - 7. Emissions into the outdoor environment of construction works
 - 8. Sustainable use of natural resources of construction works
 - ANNEX II
 - Predetermined environmental essential characteristics
 - ANNEX III
 - Product requirements
 - 1. Product requirements ensuring appropriate functioning and performance
 - 2. Product safety requirements
 - 3. Product environmental requirements
 - ANNEX IV
 - General product information, instructions for use and safety information
 - 1. General product information
 - 2. Instructions for use and safety information
 - ANNEX V
 - Declaration of performance and conformity referred to in Article 15 (1)
 - ANNEX VI
 - Procedure for requesting European technical assessments and for adopting a European assessment document
 - 1. Request for a European technical assessment
 - 2. Contract
 - 3. Communication of work programme
 - 4. The draft European assessment document
 - 5. Commission Participation
 - 6. Member States consultation
 - 7. Extension and delay
 - 8. Amendments and adoption of a draft European assessment document
 - 9. Commission assessment of draft European assessment documents
 - 10. Adoption of final European assessment document and publication
 - ANNEX VII
 - List of product families
 - ANNEX VIII
 - Requirements for TABs
 - ANNEX IX
 - Assessment and verification systems (AVS)
 - 1. System 1+
 - Full notified body control including audit sample testing
 - 2. System 1
 - Full notified body control without audit sample testing
 - 3. System 2+
 - Notified body focusing on the factory production control
 - 4. System 3+
 - Notified body’s control of environmental sustainability assessment
 - 5. System 3
 - Notified body focusing on the determination of the product type
 - 6. System 4
 - Manufacturer’s self-verification and self-certification
 - ANNEX X
 - Essential characteristics of a horizontal nature
 - ANNEX XI
 - Correlation tables