Reservoirs (Scotland) Act 2011
Reservoirs (Scotland) Act 2011 (2011 asp 9)
- Reservoirs (Scotland) Act 2011 (2011 asp 9)
- Part 1 Reservoirs
- Chapter 1 Controlled reservoirs, reservoir managers, etc.
- 1 Controlled reservoirs
- 2 Controlled reservoirs: supplementary
- 3 Reservoir managers
- 4 Multiple reservoir managers: supplementary
- 5 Duty of multiple reservoir managers to co-operate
- 6 Guidance by SEPA: management of reservoirs
- 7 SEPA
- 8 The 1975 Act and its repeal
- Chapter 2 Registration
- 9 Controlled reservoirs register
- 10 Reservoir managers' duty to register with SEPA
- 11 Controlled reservoirs required to be registered under the 1975 Act
- 12 Controlled reservoirs not required to be registered under the 1975 Act
- 13 Structures or areas which become controlled reservoirs after the relevant date
- 14 Fees: registration and administration
- 15 Registration: supplementary
- 16 Transfer of information from existing relevant authorities
- 17 Offences: registration
- Chapter 3 Risk designation
- 18 Provisional risk designation
- 19 First risk designation
- 20 Periodic review of risk designations
- 21 Decision following a periodic review
- 22 Risk designation and periodic review: matters to be taken into account
- 23 Review of SEPA's decisions giving risk designations
- 24 Appeal to the Scottish Ministers following SEPA's review
- 25 Guidance by SEPA: risk designation
- 26 High-risk reservoirs, medium-risk reservoirs and low-risk reservoirs: further provision
- Chapter 4 Panels of reservoir engineers
- 27 Panels of reservoir engineers
- 28 Appointment and removal of panel members
- 29 Dissolution of panels etc.
- 30 Review of decisions to appoint or remove civil engineers from panels etc.
- 31 Consultation with Institution of Civil Engineers
- Chapter 5 Construction or alteration of controlled reservoirs
- 32 Application of Chapter 5
- 33 Notice to SEPA and appointment of construction engineer
- 34 Inspection, reports, supervision of works etc. by construction engineer
- 35 Safety reports
- 36 Safety reports: compliance
- 37 Preliminary certificates
- 38 Construction certificates
- 39 Final certificates
- 40 Preliminary and final certificates: compliance
- 41 Termination of supervision by construction engineer
- 42 Offences: construction or alteration
- 43 Defences: offences under section 42(1)(d) or (e)
- 44 Controlled reservoirs subject to relevant works on commencement
- Chapter 6 Other requirements: high-risk reservoirs and medium-risk reservoirs
- 45 Appointment of inspecting engineer etc.
- 46 Inspections: timing
- 47 Inspections: duties of inspecting engineers etc.
- 48 Inspection reports: compliance
- 49 Appointment of supervising engineers etc.
- 50 Supervising engineer and monitoring of reservoir
- 51 Recording of water levels etc. and record keeping
- 52 Offences: inspection, supervision, record keeping
- 53 Defences: offence under section 52(1)(c)
- Chapter 7 Other requirements: controlled reservoirs
- 54 Incident reporting
- 55 Flood plans
- 56 Maintenance of records
- 57 Display of emergency response information
- 58 Offences: record keeping, display of emergency response information
- Chapter 8 Dispute referral
- 59 Referral to referee: directions in safety report or inspection report
- 60 Referral to referee: requirements in preliminary certificate or final certificate
- 61 Appointment of referee
- 62 Powers of referee: referral under section 59(2)
- 63 Powers of referee: referral under section 60(1)
- 64 Procedure
- Chapter 9 Civil enforcement, emergency powers and further offences
- Appointment of engineers
- 65 Enforcement notice: appointment of engineer
- 66 Offence: failure to comply with notice under section 65(2)
- 67 Appointment of engineer by SEPA
- 68 Appointment by SEPA: engineers' reports, certificates, recommendations etc.
- Taking of safety and other measures
- 69 Enforcement notice: safety and other measures
- 70 Offence: failure to comply with notice under section 69(2)
- 71 SEPA's power to arrange taking of safety and other measures
- 72 Offences under sections 42(1)(d) and 52(1)(c): further remedies
- Stop notices
- 73 Stop notices
- 74 Stop notices: procedure
- 75 Stop notices: compensation
- 76 Stop notices: enforcement
- Emergency powers
- 77 Emergency powers
- Other civil enforcement measures
- 78 Enforcement undertakings
- 79 Fixed monetary penalties
- 80 Fixed monetary penalties: procedure
- 81 Fixed monetary penalties: criminal proceedings and conviction etc.
- 82 Further enforcement measures
- 83 Further enforcement measures: procedure
- 84 Further enforcement measures: criminal proceedings and conviction
- 85 Further enforcement measures: enforcement
- Miscellaneous
- 86 Consultation in relation to orders under sections 73(1)... and 82(1)
- 87 Guidance as to use of stop notices... or further enforcement measures
- 88 Recovery by SEPA of expenses
- 89 Guidance: appeals
- 90 Publication of enforcement action
- 91 Powers of entry
- 92 Warrants authorising entry
- 93 Powers of entry: supplementary
- 94 Offence: preventing or obstructing entry
- 95 Compensation
- 96 Reports by SEPA to the Scottish Ministers
- 97 Affording of reasonable facilities to engineers
- 98 Power of SEPA to require information and assistance
- 99 Offences: sections 97 and 98
- Chapter 10 Miscellaneous
- 100 Guidance
- 101 Grants
- 102 Assessment of engineers' reports etc.
- 103 Notice to SEPA of revocation of appointment or resignation of engineer
- 104 SEPA: Ministerial directions
- 105 Form and content of notices, reports, certificates etc.
- 106 Notices by SEPA
- 107 Change to the Institution of Civil Engineers
- 108 Civil liability
- Part 2 Protection of the water environment – remedial and restoration measures
- 109 Remedial and restoration measures regulations
- Part 3 General
- 110 Crown application
- 111 Offences by bodies corporate
- 112 Consequential amendment and repeals
- 113 Ancillary provision
- 114 Orders and regulations
- 115 Defined expressions
- 116 Commencement and short title
- SCHEDULE Index of defined expressions