46 CFR Part 64
PART 64—MARINE PORTABLE TANKS AND CARGO HANDLING SYSTEMS
- PART 64—MARINE PORTABLE TANKS AND CARGO HANDLING SYSTEMS
- Chapter I—Coast Guard, Department of Homeland Security › Subchapter F—Marine Engineering
- Subpart A—General
- § 64.1 Purpose.
- § 64.2 Incorporation by reference.
- § 64.3 Applicability.
- § 64.5 Definitions.
- § 64.9 Maintenance, repair, and alteration of MPTs.
- Subpart B—Standards for an MPT
- § 64.11 Design of MPTs.
- § 64.13 Allowable stress; tank.
- § 64.15 Allowable stress; framework.
- § 64.17 Minimum tank thickness.
- § 64.19 External pressure.
- § 64.21 Material.
- § 64.23 Gasket and lining.
- § 64.25 Cross section.
- § 64.27 Base.
- § 64.29 Tank saddles.
- § 64.31 Inspection opening.
- § 64.33 Pipe connection.
- § 64.35 Bottom filling or discharge connection.
- § 64.37 Valve and fitting guard.
- § 64.39 Valve securing device.
- § 64.41 Stop valve closure.
- § 64.43 Lifting fittings.
- § 64.45 Securing devices.
- § 64.47 Type of relief devices.
- § 64.49 Labeling openings.
- § 64.51 Tank parts marking.
- § 64.53 Information plate for MPTs.
- § 64.55 Relief device location.
- Subpart C—Pressure Relief Devices and Vacuum Relief Devices for MPTs
- § 64.57 Acceptance of pressure relief devices.
- § 64.59 Spring loaded pressure relief valve.
- § 64.61 Rupture disc.
- § 64.63 Minimum emergency venting capacity.
- § 64.65 Vacuum relief device.
- § 64.67 Shutoff valve.
- § 64.69 Location of the pressure relief device.
- § 64.71 Marking of pressure relief devices.
- Subpart D [Reserved]
- Subpart E—Periodic Inspections and Tests of MPTs
- § 64.77 Inspection and test.
- § 64.79 Inspection of pressure and vacuum relief device.
- § 64.81 30-month inspection of an MPT.
- § 64.83 Hydrostatic test.
- Subpart F—Cargo Handling System
- § 64.87 Purpose.
- § 64.88 Plan approval, construction, and inspection of cargo-handling systems.
- § 64.89 Cargo pump unit.
- § 64.91 Relief valve for the cargo pump discharge.
- § 64.93 Pump controls.
- § 64.95 Piping.
- § 64.97 Cargo hose.