10 CFR Part 52
PART 52—LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS
- PART 52—LICENSES, CERTIFICATIONS, AND APPROVALS FOR NUCLEAR POWER PLANTS
- Chapter I—Nuclear Regulatory Commission
- General Provisions
- § 52.0 Scope; applicability of 10 CFR Chapter I provisions.
- § 52.1 Definitions.
- § 52.2 Interpretations.
- § 52.3 Written communications.
- § 52.4 Deliberate misconduct.
- § 52.5 Employee protection.
- § 52.6 Completeness and accuracy of information.
- § 52.7 Specific exemptions.
- § 52.8 Combining licenses; elimination of repetition.
- § 52.9 Jurisdictional limits.
- § 52.10 Attacks and destructive acts.
- § 52.11 Information collection requirements: OMB approval.
- Subpart A—Early Site Permits
- § 52.12 Scope of subpart.
- § 52.13 Relationship to other subparts.
- § 52.15 Filing of applications.
- § 52.16 Contents of applications; general information.
- § 52.17 Contents of applications; technical information.
- § 52.18 Standards for review of applications.
- § 52.21 Administrative review of applications; hearings.
- § 52.23 Referral to the Advisory Committee on Reactor Safeguards (ACRS).
- § 52.24 Issuance of early site permit.
- § 52.25 Extent of activities permitted.
- § 52.26 Duration of permit.
- § 52.27 Limited work authorization after issuance of early site permit.
- § 52.28 Transfer of early site permit.
- § 52.29 Application for renewal.
- § 52.31 Criteria for renewal.
- § 52.33 Duration of renewal.
- § 52.35 Use of site for other purposes.
- § 52.39 Finality of early site permit determinations.
- Subpart B—Standard Design Certifications
- § 52.41 Scope of subpart.
- § 52.43 Relationship to other subparts.
- § 52.45 Filing of applications.
- § 52.46 Contents of applications; general information.
- § 52.47 Contents of applications; technical information.
- § 52.48 Standards for review of applications.
- § 52.51 Administrative review of applications.
- § 52.53 Referral to the Advisory Committee on Reactor Safeguards (ACRS).
- § 52.54 Issuance of standard design certification.
- § 52.55 Duration of certification.
- § 52.57 Application for renewal.
- § 52.59 Criteria for renewal.
- § 52.61 Duration of renewal.
- § 52.63 Finality of standard design certifications.
- Subpart C—Combined Licenses
- § 52.71 Scope of subpart.
- § 52.73 Relationship to other subparts.
- § 52.75 Filing of applications.
- § 52.77 Contents of applications; general information.
- § 52.79 Contents of applications; technical information in final safety analysis report.
- § 52.80 Contents of applications; additional technical information.
- § 52.81 Standards for review of applications.
- § 52.83 Finality of referenced NRC approvals; partial initial decision on site suitability.
- § 52.85 Administrative review of applications; hearings.
- § 52.87 Referral to the Advisory Committee on Reactor Safeguards (ACRS).
- § 52.89 [Reserved]
- § 52.91 Authorization to conduct limited work authorization activities.
- § 52.93 Exemptions and variances.
- § 52.97 Issuance of combined licenses.
- § 52.98 Finality of combined licenses; information requests.
- § 52.99 Inspection during construction; ITAAC schedules and notifications; NRC notices.
- § 52.103 Operation under a combined license.
- § 52.104 Duration of combined license.
- § 52.105 Transfer of combined license.
- § 52.107 Application for renewal.
- § 52.109 Continuation of combined license.
- § 52.110 Termination of license.
- Subpart D [Reserved]
- Subpart E—Standard Design Approvals
- § 52.131 Scope of subpart.
- § 52.133 Relationship to other subparts.
- § 52.135 Filing of applications.
- § 52.136 Contents of applications; general information.
- § 52.137 Contents of applications; technical information.
- § 52.139 Standards for review of applications.
- § 52.141 Referral to the Advisory Committee on Reactor Safeguards (ACRS).
- § 52.143 Staff approval of design.
- § 52.145 Finality of standard design approvals; information requests.
- § 52.147 Duration of design approval.
- Subpart F—Manufacturing Licenses
- § 52.151 Scope of subpart.
- § 52.153 Relationship to other subparts.
- § 52.155 Filing of applications.
- § 52.156 Contents of applications; general information.
- § 52.157 Contents of applications; technical information in final safety analysis report.
- § 52.158 Contents of application; additional technical information.
- § 52.159 Standards for review of application.
- § 52.161 [Reserved]
- § 52.163 Administrative review of applications; hearings.
- § 52.165 Referral to the Advisory Committee on Reactor Safeguards (ACRS).
- § 52.167 Issuance of manufacturing license.
- § 52.169 [Reserved]
- § 52.171 Finality of manufacturing licenses; information requests.
- § 52.173 Duration of manufacturing license.
- § 52.175 Transfer of manufacturing license.
- § 52.177 Application for renewal.
- § 52.179 Criteria for renewal.
- § 52.181 Duration of renewal.
- Subpart G [Reserved]
- Subpart H—Enforcement
- § 52.301 Violations.
- § 52.303 Criminal penalties.
- Appendix A to Part 52—Design Certification Rule for the U.S. Advanced Boiling Water Reactor
- Appendix B to Part 52—Design Certification Rule for the System 80 + Design
- Appendix C to Part 52—Design Certification Rule for the AP600 Design
- Appendix D to Part 52—Design Certification Rule for the AP1000 Design
- Appendix E to Part 52—Design Certification Rule for the ESBWR Design
- Appendix F to Part 52—Design Certification Rule for the APR1400 Design
- Appendix G to Part 52—Design Certification Rule for NuScale
- Appendixes H-M to Part 52 [Reserved]
- Appendix N to Part 52—Standardization of Nuclear Power Plant Designs: Combined Licenses To Construct and Operate Nuclear Power Reactors of Identical Design at Multiple Sites