33 CFR Part 154
PART 154—FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK
- PART 154—FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK
- Chapter I—Coast Guard, Department of Homeland Security › Subchapter O—Pollution
- Subpart A—General
- § 154.100 Applicability.
- § 154.105 Definitions.
- § 154.106 Incorporation by reference.
- § 154.107 Alternatives.
- § 154.108 Exemptions.
- § 154.110 Letter of intent.
- § 154.120 Facility examinations.
- Subpart B—Operations Manual
- § 154.300 Operations manual: General.
- § 154.310 Operations manual: Contents.
- § 154.320 Operations manual: Amendment.
- § 154.325 Operations manual: Procedures for examination.
- Subpart C—Equipment Requirements
- § 154.500 Hose assemblies.
- § 154.510 Loading arms.
- § 154.520 Closure devices.
- § 154.525 Monitoring devices.
- § 154.530 Small discharge containment.
- § 154.540 Discharge removal.
- § 154.545 Discharge containment equipment.
- § 154.550 Emergency shutdown.
- § 154.560 Communications.
- § 154.570 Lighting.
- Subpart D—Facility Operations
- § 154.700 General.
- § 154.710 Persons in charge: Designation and qualification.
- § 154.730 Persons in charge: Evidence of designation.
- § 154.735 Safety requirements.
- § 154.740 Records.
- § 154.750 Compliance with operations manual.
- Subpart E [Reserved]
- Subpart F—Response Plans for Oil Facilities
- § 154.1010 Purpose.
- § 154.1015 Applicability.
- § 154.1016 Facility classification by COTP.
- § 154.1017 Response plan submission requirements.
- § 154.1020 Definitions.
- § 154.1025 Operating restrictions and interim operating authorization.
- § 154.1026 Qualified individual and alternate qualified individual.
- § 154.1028 Methods of ensuring the availability of response resources by contract or other approved means.
- § 154.1029 Worst case discharge.
- § 154.1030 General response plan contents.
- § 154.1035 Specific requirements for facilities that could reasonably be expected to cause significant and substantial harm to the environment.
- § 154.1040 Specific requirements for facilities that could reasonably be expected to cause substantial harm to the environment.
- § 154.1041 Specific response information to be maintained on mobile MTR facilities.
- § 154.1045 Response plan development and evaluation criteria for facilities that handle, store, or transport Group I through Group IV petroleum oils.
- § 154.1047 Response plan development and evaluation criteria for facilities that handle, store, or transport Group V petroleum oils.
- § 154.1050 Training.
- § 154.1055 Exercises.
- § 154.1057 Inspection and maintenance of response resources.
- § 154.1060 Submission and approval procedures.
- § 154.1065 Plan review and revision procedures.
- § 154.1070 Deficiencies.
- § 154.1075 Appeal process.
- Subpart G—Additional Response Plan Requirements for a Trans-Alaska Pipeline Authorization Act (TAPAA) Facility Operating in Prince William Sound, Alaska
- § 154.1110 Purpose and applicability.
- § 154.1115 Definitions.
- § 154.1120 Operating restrictions and interim operating authorization.
- § 154.1125 Additional response plan requirements.
- § 154.1130 Requirements for prepositioned response equipment.
- § 154.1135 Response plan development and evaluation criteria.
- § 154.1140 TAPAA facility contracting with a vessel.
- Subpart H—Response Plans for Animal Fats and Vegetable Oils Facilities
- § 154.1210 Purpose and applicability.
- § 154.1216 Facility classification.
- § 154.1220 Response plan submission requirements.
- § 154.1225 Specific response plan development and evaluation criteria and other requirements for fixed facilities that handle, store, or transport animal fats or vegetable oils.
- § 154.1228 Methods of ensuring the availability of response resources by contract or other approved means.
- § 154.1240 Specific requirements for animal fats and vegetable oils facilities that could reasonably be expected to cause substantial harm to the environment.
- Subpart I—Response Plans for Other Non-Petroleum Oil Facilities
- § 154.1310 Purpose and applicability.
- § 154.1320 Response plan submission requirements.
- § 154.1325 Response plan development and evaluation criteria for facilities that handle, store, or transport other non-petroleum oils.
- Subparts J-O [Reserved]
- Subpart P—Marine Vapor Control Systems
- General
- § 154.2000 Applicability.
- § 154.2001 Definitions.
- Certifying Entities
- § 154.2010 Qualifications for acceptance as a certifying entity.
- § 154.2011 Application for acceptance as a certifying entity.
- Certification, Recertification, and Operational Review
- § 154.2020 Certification and recertification—owner/operator responsibilities.
- § 154.2021 Operational review—owner/operator responsibilities.
- § 154.2022 Certification, recertification, or operational review—certifying entity responsibilities, generally.
- § 154.2023 Recertification—certifying entity responsibilities, generally.
- § 154.2024 Operational review—certifying entity responsibilities, generally.
- § 154.2025 Certification, recertification, or operational review—certifying entity documentation.
- Personnel
- § 154.2030 Transfer facilities.
- § 154.2031 Tank barge cleaning facilities.
- Transfer Facilities—VCS Design and Installation
- § 154.2100 Vapor control system, general.
- § 154.2101 Requirements for facility vapor connections.
- § 154.2102 Facility requirements for vessel liquid overfill protection.
- § 154.2103 Facility requirements for vessel vapor overpressure and vacuum protection.
- § 154.2104 Pigging system.
- § 154.2105 Fire, explosion, and detonation protection.
- § 154.2106 Detonation arresters installation.
- § 154.2107 Inerting, enriching, and diluting systems.
- § 154.2108 Vapor-moving devices.
- § 154.2109 Vapor recovery and vapor destruction units.
- § 154.2110 Vapor balancing requirements.
- § 154.2111 Vapor control system connected to a facility's main vapor control system.
- § 154.2112 Vapors with potential to polymerize or freeze—Special requirements.
- § 154.2113 Alkylene oxides—Special requirements.
- Transfer Facilities—Operations
- § 154.2150 General requirements.
- Alternative Analyzer and Pressure Sensor Reliability Testing
- § 154.2180 Alternative testing program—Generally.
- § 154.2181 Alternative testing program—Test requirements.
- Tank Barge Cleaning Facilities—VCS Design and Installation
- § 154.2200 Applicable transfer facility design and installation requirements.
- § 154.2201 Vapor control system—general requirements.
- § 154.2202 Vapor line connections.
- § 154.2203 Facility requirements for barge vapor overpressure and vacuum protection.
- § 154.2204 Fire, explosion, and detonation protection.
- Tank Barge Cleaning Facilities—Operations
- § 154.2250 General requirements.
- Appendix A to Part 154—Guidelines for Detonation Flame Arresters
- Appendix B to Part 154 [Reserved]
- Appendix C to Part 154—Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans
- Appendix D to Part 154—Training Elements for Oil Spill Response Plans