10 CFR Part 960
PART 960—GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY
- PART 960—GENERAL GUIDELINES FOR THE PRELIMINARY SCREENING OF POTENTIAL SITES FOR A NUCLEAR WASTE REPOSITORY
- Chapter III—Department of Energy
- Subpart A—General Provisions
- § 960.1 Applicability.
- § 960.2 Definitions.
- Subpart B—Implementation Guidelines
- § 960.3 Implementation guidelines.
- § 960.3-1 Siting provisions.
- § 960.3-1-1 Diversity of geohydrologic settings.
- § 960.3-1-2 Diversity of rock types.
- § 960.3-1-3 Regionality.
- § 960.3-1-4 Evidence for siting decisions.
- § 960.3-1-4-1 Site identification as potentially acceptable.
- § 960.3-1-4-2 Site nomination for characterization.
- § 960.3-1-4-3 Site recommendation for characterization.
- § 960.3-1-5 Basis for site evaluations.
- § 960.3-2 Siting process.
- § 960.3-2-1 Site screening for potentially acceptable sites.
- § 960.3-2-2 Nomination of sites as suitable for characterization.
- § 960.3-2-2-1 Evaluation of all potentially acceptable sites.
- § 960.3-2-2-2 Selection of sites within geohydrologic settings.
- § 960.3-2-2-3 Comparative evaluation of all sites proposed for nomination.
- § 960.3-2-2-4 The environmental assessment.
- § 960.3-2-2-5 Formal site nomination.
- § 960.3-2-3 Recommendation of sites for characterization.
- § 960.3-3 Consultation.
- § 960.3-4 Environmental impacts.
- Subpart C—Postclosure Guidelines
- § 960.4 Postclosure guidelines.
- § 960.4-1 System guideline.
- § 960.4-2 Technical guidelines.
- § 960.4-2-1 Geohydrology.
- § 960.4-2-2 Geochemistry.
- § 960.4-2-3 Rock characteristics.
- § 960.4-2-4 Climatic changes.
- § 960.4-2-5 Erosion.
- § 960.4-2-6 Dissolution.
- § 960.4-2-7 Tectonics.
- § 960.4-2-8 Human interference.
- § 960.4-2-8-1 Natural resources.
- § 960.4-2-8-2 Site ownership and control.
- Subpart D—Preclosure Guidelines
- § 960.5 Preclosure guidelines.
- § 960.5-1 System guidelines.
- § 960.5-2 Technical guidelines.
- Preclosure Radiological Safety
- § 960.5-2-1 Population density and distribution.
- § 960.5-2-2 Site ownership and control.
- § 960.5-2-3 Meteorology.
- § 960.5-2-4 Offsite installations and operations.
- Environment, Socioeconomics, and Transportation
- § 960.5-2-5 Environmental quality.
- § 960.5-2-6 Socioeconomic impacts.
- § 960.5-2-7 Transportation.
- Ease and Cost of Siting, Construction, Operation, and Closure
- § 960.5-2-8 Surface characteristics.
- § 960.5-2-9 Rock characteristics.
- § 960.5-2-10 Hydrology.
- § 960.5-2-11 Tectonics.
- Appendix I to Part 960—NRC and EPA Requirements for Postclosure Repository Performance
- Appendix II to Part 960—NRC and EPA Requirements for Preclosure Repository Performance
- Appendix III to Part 960—Application of the System and Technical Guidelines During the Siting Process
- Appendix IV to Part 960—Types of Information for the Nomination of Sites as Suitable for Characterization